HIGHWAY BANTING-TAIPING
The Construction And Completion Of West Coast Expressway For Package Works For Section 3,4,5,8 & 9 (the “Works Contract Works” or the “Project”) Steel Girder At Bridge.
- Scope of work : Fabrication & Erection
- Capacity/Size : 2000 Ton
![bsh](https://preserverengineering.com/wp-content/uploads/2019/09/IJM-WCE_1.jpg)
![IJM WCE_2](https://preserverengineering.com/wp-content/uploads/2019/09/IJM-WCE_2.jpg)
![IJM WCE_3](https://preserverengineering.com/wp-content/uploads/2019/09/IJM-WCE_3.jpg)
![bsh](https://preserverengineering.com/wp-content/uploads/2019/09/IJM-WCE_4.jpg)
![IJM WCE_5](https://preserverengineering.com/wp-content/uploads/2019/09/IJM-WCE_5.jpg)