Bridges
![](https://preserverengineering.com/wp-content/uploads/2019/09/IJM-WCE_2-300x225.jpg)
IJM, WCE BRIDGE
HIGHWAY BANTING-TAIPING The Construction And Completion Of West Coast Expressway For Package Works For Section 3,4,5,8 & 9 (the “Works Contract Works” or the “Project”)
![](https://preserverengineering.com/wp-content/uploads/2019/09/QUILL_3-300x225.jpg)
QUILL, SKYBRIDGE
DAMANSARA Cadangan Pembangunan 2 Block Service Apartment Mewah 57 Tingkat (752 Units) Beserta 5 Tingkat Tempat Letak Kereta Paras Bawah Dan Kemudahan – Kemudahan Awam
![](https://preserverengineering.com/wp-content/uploads/2019/09/PAVILION-LINKBRIDGE_3-1-300x200.png)
IMPIANA HOTEL AND LINK BRIDGE TO PAVILION
KLCC The Design, Construction and Completion of the Proposed Link Bridge Phase 2 From Impiana KLCC to Jalan Raja Chulan (Pavilion KL), Kuala Lumpur for
![](https://preserverengineering.com/wp-content/uploads/2019/09/KEYSTONE_1-300x273.png)
KEYSTONE, LINKBRIDGE OVER KTM RAILWAY
BANGSAR Cadangan Membina Sebuah Jejantas Yang Menghubungkan Pembangunan Hotel/Service Suite serta Pengubahsuaian Stesen LRT Bangsar untuk Tetuan Keystone Land Development. Scope of work : Substructure,
![](https://preserverengineering.com/wp-content/uploads/2019/09/SUNWAY-BRT_3-300x225.jpg)
SUNWAY BRT GUIDEWAY
KUALA LUMPUR Steel Structure Construction and Completion of Guideway Steel Structure for Pie 132 to Pier 135, Pier 84 to Pier 87, Pier 51 to
![](https://preserverengineering.com/wp-content/uploads/2019/09/m1-300x231.jpg)
M-CITY
KUALA LUMPUR Package 2 Consist of The Execution and Completion of Main Building Works for Cadangan Pembangunan 3 Blok Pangsapuri Servis 37 Tingkat Di Atas
Navigation
Address
Head Office
No. 1-1F, Jalan Setia Perdana BC, U13/BC Seria 88 Business Centre, Setia Alam, 40170 Shah Alam, Selangor
Fabrication Factory
Lot 576, Jalan Merbau Off Jalan Klang Perdana, Batu 7 ½, Jalan Kapar, 42200 Kapar, SELANGOR