KLCC
The Design, Construction and Completion of the Proposed Link Bridge Phase 2 From Impiana KLCC to Jalan Raja Chulan (Pavilion KL), Kuala Lumpur for KLCC (Holdings) Sdn Bhd.
- Scope of work : Fabrication & Erection
- Capacity/Size : 550 Ton
The Design, Construction and Completion of the Proposed Link Bridge Phase 2 From Impiana KLCC to Jalan Raja Chulan (Pavilion KL), Kuala Lumpur for KLCC (Holdings) Sdn Bhd.
Head Office
No. 1-1F, Jalan Setia Perdana BC, U13/BC Seria 88 Business Centre, Setia Alam, 40170 Shah Alam, Selangor
Fabrication Factory
Lot 576, Jalan Merbau Off Jalan Klang Perdana, Batu 7 ½, Jalan Kapar, 42200 Kapar, SELANGOR